top of page

​

Mechanical Validation for Coating & Decoating Processes

MERCEDES%20BENZ%20TURK_edited.jpg

 TASK:

 To decrease material loss and increase the recycling ratio during decoating on commercial busses

​

 SOLUTION:

  • Experiencing Connection Modelling of Plastics & Composites

  • Using Real Bolt & Weld Connection Data into FE Part Model

  • Analyzing delamination (damage) area of one hybrid part (plastic+ steel )

  • Combined load cases

  • Linear & nonlinear (contact) models can be superposed

  • Time series and/or spectra input possible

  • Heat, NVH and structural analyses were performed
     

%17

Raw meterial usage decrease

​

​

EUR 1,4 milion

Increase in annual 

Profit off recycling

Çapa Mercedes Project

Early Phase Damage Detection

DLR_Logo_edited.jpg

 TASK:

To monitor manufacturing line based on post-production and pre-assembling phases for early crack occurrences

​

 SOLUTION:

  • Testing and experimenting with different robot grippers and hands, including dexterous hands and hardware (grippers and hand solution).

  • Calculation of the optimum force for the gripper will be calculated via Al based software

  • Al based software and vision components that comprise simulation integrating temperature and physical parameters to support better gripping/manipulation of deformable objects

%26

Crack detection increase

​

​

%11

Optimization of part assembling

Çapa DLR Project

Process Monitoring and AI Based Control Unit

asko logo yeni.png

 TASK:

  • Increase the quality of manufacturing process by monitoring essential process parameters

  • Reduce the ignorance of minor damages on components, therefore part turnover will reduce

​

 SOLUTION:

  • Process monitoring and reporting software helps operators maintain control of the process. The process Controller Unit is developed and integrated into the process. This unit is controlled by the Al Unit based on the decisions made by itself.

  • The Al-Based Process Controller Unit will unable the Al Unit to directly control the process based on its decisions. Thus, this unit will greatly reduce or completely eliminate the need for the operator to intervene in the process.

%19

Reduction in

miss-production

​

​

EUR 0.6 million

Foreseen increase in annual profit

Çapa ASKO Project
bottom of page